They are very close to 6% for 10.5mm crush material even by just using a DMS circuit; I think the 10.5mm crush material would be better product to be transporting particularly when talking about bulka bags ; you are less prone to dusting waste. Adding water to prevent this during transport just means that you are transporting water... Clients will not pay you for the water.
Can it be stockpiled longer... I don't know tbh. I'd prefer the larger particle size ; smaller particle sizes through DMS just means more grinding / crushing. I suppose a way to get the larger 10.5mm particles with the 6% grade through is to mine/pit from say zones of consistently higher grade material which based on the initial results ; this would most likely gift us with 10.5mm at 6%+ through DMS.
I think that switching to flotation is definitely part of the overall plan; plan being to generate cashflow first and then reel floatation in.
- Forums
- ASX - By Stock
- AVZ
- Ann: Positive Results from Initial Metallurgical Test Work
Ann: Positive Results from Initial Metallurgical Test Work, page-98
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AVZ (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online