The ASX is worse than the casino. its either banker or player at the casino no bullshit about that.
You can do all the research you like, but been constantly feed bull shit from directors makes all the research worth nothing if what their saying is the opposite to what's really going on.
Its obvious that nothing is coming of the concrete additive as there's no provision for that in the latest announcement
I sold out some time ago, with the plan to get back in once FFX/LLL had completed the split putting all the funds it into FFX and planning on selling FFX to get back in
Now both ADN and FFX have turned out to be at the top of the list on the bullshit register.
i even convinced my daughter to buy her first ever shares in ADN, posted the fact here with a lot of posters saying how well she will do but 1 stood out and said why? get her into CFDs as much safer, well how true that has turned out.
And there's the double whammy there for me, as i have guaranteed anything she lost.
Just lucky I have still the LLL shares after the split.
Good luck everyone and i do prefer Banker over Player.
- Forums
- ASX - By Stock
- ADN
- Ann: Procurement of Long Lead Items for the Great White Project
Ann: Procurement of Long Lead Items for the Great White Project, page-287
-
- There are more pages in this discussion • 328 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ADN (ASX) to my watchlist
|
|||||
Last
0.9¢ |
Change
-0.001(10.0%) |
Mkt cap ! $27.99M |
Open | High | Low | Value | Volume |
1.0¢ | 1.1¢ | 0.9¢ | $564.0K | 60.56M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
12 | 3996555 | 0.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.0¢ | 25407916 | 18 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
12 | 3996555 | 0.009 |
48 | 19249920 | 0.008 |
14 | 8982570 | 0.007 |
8 | 6915000 | 0.006 |
6 | 7100000 | 0.005 |
Price($) | Vol. | No. |
---|---|---|
0.010 | 25407916 | 18 |
0.011 | 23506714 | 19 |
0.012 | 28197099 | 15 |
0.013 | 2841801 | 11 |
0.014 | 2114645 | 5 |
Last trade - 16.10pm 26/08/2024 (20 minute delay) ? |
Featured News
ADN (ASX) Chart |