ADN 10.0% 0.9¢ andromeda metals limited

Ann: Procurement of Long Lead Items for the Great White Project, page-316

  1. 151 Posts.
    lightbulb Created with Sketch. 96
    my initial thoughts and actions were to sell a tranche, I’m still holding a small amount. I feel like it’s an understatement to discuss loss of trust and transparency, like, really? The story potentially still has credibility, but the authors are full of “lack of credibility”, “loss of trust”, “inability to come through”, “outcomes don’t match promises”.
    so a small holding probably doesn’t cause me much worry, but very disappointed, and if a class action was mooted, I’d probably join. I think that there has been a lot of misplaced trust in the storytellers , ie, directors.

 
watchlist Created with Sketch. Add ADN (ASX) to my watchlist
(20min delay)
Last
0.9¢
Change
-0.001(10.0%)
Mkt cap ! $27.99M
Open High Low Value Volume
1.0¢ 1.1¢ 0.9¢ $564.0K 60.56M

Buyers (Bids)

No. Vol. Price($)
12 3996555 0.9¢
 

Sellers (Offers)

Price($) Vol. No.
1.0¢ 25407916 18
View Market Depth
Last trade - 16.10pm 26/08/2024 (20 minute delay) ?
ADN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.