Being a long term holder of adn is starting to feel like being in a abusive relationship. Hopefully not the case and that it can be similar to my support of Arsenal FC. With enough patience, there will be some sign of optimism for the future.
- Forums
- ASX - By Stock
- Ann: Procurement of Long Lead Items for the Great White Project
Being a long term holder of adn is starting to feel like being...
- There are more pages in this discussion • 243 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ADN (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $59.09M |
Open | High | Low | Value | Volume |
1.9¢ | 1.9¢ | 1.8¢ | $89.12K | 4.762M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
9 | 1306876 | 1.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.0¢ | 6104618 | 22 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
9 | 1306876 | 0.018 |
12 | 7303074 | 0.017 |
42 | 9272136 | 0.016 |
24 | 3875550 | 0.015 |
5 | 1458544 | 0.014 |
Price($) | Vol. | No. |
---|---|---|
0.020 | 6104618 | 22 |
0.021 | 4330830 | 7 |
0.022 | 1730273 | 8 |
0.023 | 1481330 | 7 |
0.024 | 2195028 | 9 |
Last trade - 10.17am 07/05/2024 (20 minute delay) ? |
|
|||||
Last
1.8¢ |
  |
Change
0.000 ( 1.64 %) |
|||
Open | High | Low | Volume | ||
1.8¢ | 1.9¢ | 1.8¢ | 3265009 | ||
Last updated 10.35am 07/05/2024 ? |
Featured News
ADN (ASX) Chart |
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Steven Gourlay, CEO
Steven Gourlay
CEO
Previous Video
Next Video
SPONSORED BY The Market Online