Incorrect. I had a million MEP which I still have now in the form of 1.15m ADN. If ADN would have paid me 20c I would have been laughing, as I had held for over 12 months.
ADN paid 1.15ADN per MEP and not a $ figure, which in terms of % was a slight discount, especially on NNT
The only people that would have been paid 20c is those overseas investors who were ineligible for the TO scrip offer and that was a small %
I am still up on my MEP shares converted to ADN though, even after these dark days, and I am sitting tight.
- Forums
- ASX - By Stock
- Ann: Procurement of Long Lead Items for the Great White Project
Incorrect. I had a million MEP which I still have now in the...
-
-
- There are more pages in this discussion • 60 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ADN (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.8¢ |
Change
-0.001(11.1%) |
Mkt cap ! $27.14M |
Open | High | Low | Value | Volume |
0.8¢ | 0.9¢ | 0.8¢ | $116.9K | 13.85M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
38 | 23045475 | 0.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.9¢ | 19960862 | 18 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
38 | 23045475 | 0.008 |
32 | 19216958 | 0.007 |
14 | 9567999 | 0.006 |
6 | 6825000 | 0.005 |
1 | 4500000 | 0.004 |
Price($) | Vol. | No. |
---|---|---|
0.009 | 19960862 | 18 |
0.010 | 24520994 | 15 |
0.011 | 16993479 | 8 |
0.012 | 23711434 | 9 |
0.013 | 2351111 | 6 |
Last trade - 16.10pm 02/09/2024 (20 minute delay) ? |
Featured News
ADN (ASX) Chart |