What I am saying is that the company is still moving from being an exploration business to being a miner. That in itself is a very big step.
They are starting with a smaller plant, to be expanded over time ... if you think that things have not changed in the world over the last 3 years then you've been in a coma.
I know of two very big projects that have had to go back to the market to advise that the costs of construction have increased dramatically post DFS.
If ADN think that it is better to construct in stages to keep the costs at an acceptable level that is wisdom .. telling you "seriously"
- Forums
- ASX - By Stock
- ADN
- Ann: Procurement of Long Lead Items for the Great White Project
Ann: Procurement of Long Lead Items for the Great White Project, page-153
- There are more pages in this discussion • 462 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ADN (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $52.87M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 1180207 | 1.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.4¢ | 9785 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 1180207 | 0.018 |
46 | 13455908 | 0.017 |
26 | 6697616 | 0.016 |
13 | 7300033 | 0.015 |
4 | 1276428 | 0.014 |
Price($) | Vol. | No. |
---|---|---|
0.014 | 9785 | 1 |
0.016 | 100917 | 1 |
0.017 | 650000 | 2 |
0.018 | 400000 | 1 |
0.019 | 777777 | 3 |
Last trade - 09.42am 14/06/2024 (20 minute delay) ? |
|
|||||
Last
1.8¢ |
  |
Change
0.000 ( 2.70 %) |
|||
Open | High | Low | Volume | ||
1.8¢ | 1.8¢ | 1.8¢ | 470920 | ||
Last updated 10.04am 14/06/2024 ? |
Featured News
ADN (ASX) Chart |
Day chart unavailable