I would call the requirement for detailed engineering plain BS used to justify delays. Exactly what the MEP takeover was.
They have ordered some long lead time equipment. How would it be possible to specify, select and order these items without detailed engineering design?
- Forums
- ASX - By Stock
- ADN
- Ann: Prospectus - Capital Raising
Ann: Prospectus - Capital Raising, page-81
-
- There are more pages in this discussion • 56 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ADN (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.7¢ |
Change
0.001(8.33%) |
Mkt cap ! $22.28M |
Open | High | Low | Value | Volume |
0.6¢ | 0.7¢ | 0.6¢ | $50.96K | 8.255M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
31 | 7954833 | 0.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.7¢ | 7895228 | 18 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
31 | 7954833 | 0.006 |
41 | 22930557 | 0.005 |
9 | 10350000 | 0.004 |
7 | 12334995 | 0.003 |
7 | 15650497 | 0.002 |
Price($) | Vol. | No. |
---|---|---|
0.007 | 7745228 | 17 |
0.008 | 6774409 | 19 |
0.009 | 12168689 | 19 |
0.010 | 4296882 | 7 |
0.011 | 27266522 | 7 |
Last trade - 15.59pm 06/11/2024 (20 minute delay) ? |
Featured News
ADN (ASX) Chart |