Nice item's of Note in the Scoping Study
Scoping Study
Mine design and production Figure 3 - View from the portal during installation of the air lock structure scheduling covering the much larger, 469,000 Oz AuEq mineral resource, is likely to point towards a significantly larger, longer life operation than has previously been considered. It is equally likely that, considering the increased grade of the recently upgraded mineral resource (6.6g/t AuEq vs 15.1 g/t AuEq), that economic prospects for the project will increase significantly.
Nice item's of Note in the Scoping Study Scoping Study Mine...
Add to My Watchlist
What is My Watchlist?