SMN 1.45% 35.0¢ structural monitoring systems plc

Hi LV, I think it takes longer than 4 days to completed, because...

  1. 270 Posts.
    lightbulb Created with Sketch. 9
    Hi LV, I think it takes longer than 4 days to completed, because in order to perform manual inspection, it is required remove internal surrounding structures so that inspectors can access the internal structures and the process of removing surrounding structures normally takes about 4 days by 20 technicians and about the same time to reinstall once finished.

    I think in the mean time SMN sp will recover along with Boeing and other airlines and once CVM receive full approval from FAA then the sky is no limit

    DYOR

 
watchlist Created with Sketch. Add SMN (ASX) to my watchlist
(20min delay)
Last
35.0¢
Change
0.005(1.45%)
Mkt cap ! $47.88M
Open High Low Value Volume
35.0¢ 35.5¢ 35.0¢ $27.94K 79.83K

Buyers (Bids)

No. Vol. Price($)
2 2967 34.5¢
 

Sellers (Offers)

Price($) Vol. No.
37.0¢ 20000 1
View Market Depth
Last trade - 16.10pm 15/05/2024 (20 minute delay) ?
Last
35.0¢
  Change
0.005 ( 4.48 %)
Open High Low Volume
35.0¢ 35.0¢ 34.5¢ 10982
Last updated 15.14pm 15/05/2024 ?
SMN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.