SMN 2.94% 35.0¢ structural monitoring systems plc

Ann: Quarterly Activities Report, page-52

  1. 270 Posts.
    lightbulb Created with Sketch. 9
    Hi LV, I think it takes longer than 4 days to completed, because in order to perform manual inspection, it is required remove internal surrounding structures so that inspectors can access the internal structures and the process of removing surrounding structures normally takes about 4 days by 20 technicians and about the same time to reinstall once finished.

    I think in the mean time SMN sp will recover along with Boeing and other airlines and once CVM receive full approval from FAA then the sky is no limit

    DYOR

 
watchlist Created with Sketch. Add SMN (ASX) to my watchlist
(20min delay)
Last
35.0¢
Change
0.010(2.94%)
Mkt cap ! $47.88M
Open High Low Value Volume
34.0¢ 36.0¢ 34.0¢ $11.43K 32.75K

Buyers (Bids)

No. Vol. Price($)
2 30400 33.5¢
 

Sellers (Offers)

Price($) Vol. No.
36.0¢ 4954 1
View Market Depth
Last trade - 15.44pm 04/06/2024 (20 minute delay) ?
Last
34.5¢
  Change
0.010 ( 1.47 %)
Open High Low Volume
35.0¢ 35.5¢ 34.5¢ 14138
Last updated 15.44pm 04/06/2024 ?
SMN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.