HIGHLIGHTS
• The depth of the mineralised Tolubay Suite has increased significantly on section 8 at Obdilla, highlighting the potential for a substantial gold resource to be delineated.
• The 241m deep hole ZDDH034 intercepted 203m at 1.8g/t Au from surface, with assays awaited for the bottom 38m of the hole, which was terminated prior to reaching the footwall of massive limestone.
• Hole ZDDH035 ended at 290m, still in the Tolubay Suite - results are awaited for this hole and holes ZDDH036 and ZDDH037.
• Intercepts from two shallower holes on section 8 included 74m at 1.8g/t (including 17m at 4.2 g/t) and 74m at 1.4g/t Au.
• The target zone gets wider as well as deeper to the west. It is 150m wide at planned section 9, located 115m west of section 8 - drilling will start shortly.
- Forums
- ASX - By Stock
- PRU
- more big gold intersections
more big gold intersections
Featured News
Add PRU (ASX) to my watchlist
(20min delay)
|
|||||
Last
$2.33 |
Change
-0.060(2.51%) |
Mkt cap ! $3.228B |
Open | High | Low | Value | Volume |
$2.36 | $2.39 | $2.32 | $4.337M | 1.844M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
30 | 49644 | $2.33 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$2.34 | 74977 | 46 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
31 | 52877 | 2.330 |
35 | 97189 | 2.320 |
17 | 90789 | 2.310 |
27 | 87085 | 2.300 |
8 | 101534 | 2.290 |
Price($) | Vol. | No. |
---|---|---|
2.340 | 74977 | 46 |
2.350 | 128530 | 35 |
2.360 | 121879 | 20 |
2.370 | 65258 | 15 |
2.380 | 243773 | 8 |
Last trade - 12.23pm 30/05/2024 (20 minute delay) ? |
|
|||||
Last
$2.31 |
  |
Change
-0.060 ( 3.41 %) |
|||
Open | High | Low | Volume | ||
$2.37 | $2.39 | $2.31 | 704322 | ||
Last updated 12.42pm 30/05/2024 ? |
Featured News
PRU (ASX) Chart |
The Watchlist
AHK
ARK MINES LIMITED
Ben Emery, Executive Director
Ben Emery
Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online