SHP 0.00% 1.0¢ south harz potash ltd

Ann: Second Hole Drilling Commences, page-33

  1. 1,862 Posts.
    lightbulb Created with Sketch. 467
    I contacted the company, posted the answer in another thread. I was told they will release the drill results from the first hole when they have them, not wait for second hole or scoping study.

    The delay is at the lab, caused in part by there being more core samples than the lab expected.

    One would hope results are near now!

    I can’t post the email, it got modded last time as I did not have permission to post it.

    cheers
    kk
 
watchlist Created with Sketch. Add SHP (ASX) to my watchlist
(20min delay)
Last
1.0¢
Change
0.000(0.00%)
Mkt cap ! $8.272M
Open High Low Value Volume
1.0¢ 1.0¢ 1.0¢ $19.01K 1.905M

Buyers (Bids)

No. Vol. Price($)
2 1047616 1.0¢
 

Sellers (Offers)

Price($) Vol. No.
1.1¢ 1897153 8
View Market Depth
Last trade - 15.36pm 04/06/2024 (20 minute delay) ?
Last
1.0¢
  Change
0.000 ( 0.00 %)
Open High Low Volume
1.0¢ 1.0¢ 0.9¢ 3241238
Last updated 15.36pm 04/06/2024 ?
SHP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.