VR8 2.27% 4.5¢ vanadium resources limited

A year and a half allocated for engineering and procurement in...

  1. 90 Posts.
    lightbulb Created with Sketch. 11
    A year and a half allocated for engineering and procurement in the revised timeline is absurd. The timeline in the presentation given in April 2022 had us producing by H1 2024. Now this is set for H2 2026. absolutely ridiculous blow out.
    https://hotcopper.com.au/data/attachments/5626/5626922-3bb71f4848e8cd3be222dcc4d4e36cd0.jpg
 
watchlist Created with Sketch. Add VR8 (ASX) to my watchlist
(20min delay)
Last
4.5¢
Change
0.001(2.27%)
Mkt cap ! $25.21M
Open High Low Value Volume
4.5¢ 4.5¢ 4.5¢ $15.19K 337.5K

Buyers (Bids)

No. Vol. Price($)
2 200000 4.4¢
 

Sellers (Offers)

Price($) Vol. No.
4.5¢ 404749 1
View Market Depth
Last trade - 12.47pm 30/04/2024 (20 minute delay) ?
Last
4.5¢
  Change
0.001 ( 2.27 %)
Open High Low Volume
4.5¢ 4.5¢ 4.5¢ 36236
Last updated 10.20am 30/04/2024 ?
VR8 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.