TNG announcement :
metallurgical consultants METS
From VMC
The metallurgical test work by METS Engineering Group was initiated to see if the widespread vanadium values
Same lab who worked through the process with CSIRO & who TNG now owns the patent library.
If they weren't looking at TIVAN before, METS will at least put it on VMCs radar or, & this is speculation with a twist, test it in the TIVAN process.
When I worked for another Mineral Technology companies, we had a test lab which the metallurgists would reconfigure depending on the required ore body to be tested. This was a building on its own with lots of legacy arrangement testing equipment.
Occasionally we'd be contracted to build a small throughput containerized test rig - they weren't cheap but cheaper than building a full sized plant to discover that the ore body wasn't suitable or process was not the right one.....
So there is a very good possibility that METS will still have all the test equipment in the TIVAN formation & simple reconfiguration of process flows etc might mean that VMC end up proving their ore body using TIVAN. IOW minimized cost, minimized time frames as they don't have to specially design from scratch or order long lead items to test the ore. If I was a junior wanting to maximize the value of my ore whilst minimizing the cost to prove it can be seperated & refined, I'd go to METS & talk to them about this fancy schmancy new process called TIVAN.
Just a theory, but worth some consideration.
- Forums
- ASX - By Stock
- Ann: TNG strengthens Mine Development Executive Team
TNG announcement : metallurgical consultants METS From VMC The...
-
-
- There are more pages in this discussion • 59 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TVN (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.5¢ |
Change
0.001(1.85%) |
Mkt cap ! $94.75M |
Open | High | Low | Value | Volume |
5.5¢ | 5.7¢ | 5.4¢ | $51.52K | 929.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 195625 | 5.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.5¢ | 37162 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 195625 | 0.054 |
4 | 363224 | 0.053 |
5 | 297449 | 0.052 |
3 | 703700 | 0.051 |
8 | 434000 | 0.050 |
Price($) | Vol. | No. |
---|---|---|
0.055 | 37162 | 2 |
0.056 | 164902 | 2 |
0.060 | 50000 | 1 |
0.061 | 58237 | 1 |
0.062 | 281200 | 3 |
Last trade - 16.10pm 31/07/2024 (20 minute delay) ? |
Featured News
TVN (ASX) Chart |
The Watchlist
CCO
THE CALMER CO INTERNATIONAL LIMITED
Anthony Noble, CEO
Anthony Noble
CEO
SPONSORED BY The Market Online