Some background I found:
What is clear from some of the historical info is the problems of BMA related to:
- Attempt to high grade resource, which did not work (BMA mined 10 g/t Au not the 30 g/t they planned), they needed to have much higher grades as gold price was around A800/oz and ore was trucked about 300km to mill.
- Resource hangs together better at lower cut-off grades which is possible at current gold prices.
NQM looked at open pit mining and UG at 309 in 2009m before being taken over by Conquest (A$1500/oz)
https://www.asx.com.au/asxpdf/20091210/pdf/31mn9hm2xv8r93.pdf
Lone Sister info
https://www.asx.com.au/asxpdf/20100204/pdf/31njfcdn4y5qnr.pdf
Reserve Quoted at 309 (A$1500/oz)
https://www.asx.com.au/asxpdf/20100413/pdf/31pr98fpkbdkj2.pdfMore light reading
https://www.asx.com.au/asxpdf/20081222/pdf/31f9wt6swm5kp6.pdf
- Forums
- ASX - By Stock
- Ann: Transformational Acquisition of Twin Hills Gold Project
Some background I found:What is clear from some of the...
-
-
- There are more pages in this discussion • 32 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GBZ (ASX) to my watchlist
|
|||||
Last
1.0¢ |
Change
0.001(11.1%) |
Mkt cap ! $11.56M |
Open | High | Low | Value | Volume |
1.1¢ | 1.1¢ | 1.0¢ | $17.83K | 1.679M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 855555 | 0.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.0¢ | 4306 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 855555 | 0.009 |
6 | 2095797 | 0.008 |
2 | 3200000 | 0.007 |
1 | 250000 | 0.006 |
2 | 370000 | 0.005 |
Price($) | Vol. | No. |
---|---|---|
0.010 | 4306 | 1 |
0.011 | 987179 | 2 |
0.012 | 2156448 | 5 |
0.013 | 1444816 | 3 |
0.014 | 1343581 | 4 |
Last trade - 14.23pm 08/07/2024 (20 minute delay) ? |
Featured News
GBZ (ASX) Chart |