With the rejection of the plant and the costing of it i do agree with lck n the team.
ive done many projects and costing and what tend to happen that the engineers will over do the cost and the project when there far much cheaper ways on doing things, building to products things tend to cost more but there far much cheaper ways on doing thing, sometimes things are just over done and its pointless to have 10mm thick steel when 2.5m is enough to do the job.
there alot of stupid engineers that don't have a brain and do not think on method or real world.
this was meantion in lck video about stacking stations ontop of each other to compare spreading them out to save cost this is why the reject there report because they like less build a 3 stack plant when lck is like why dont we make it one level.... the engineers be like no do it 3 stack to save room and lck like we have plenty of room.
Even the footings they will over do them when its not even not even close to what is for Australian standards.
for example 5 years ago i had a report that i had to do footing and hole down 2.1m when the clay is 1m and the draft man even spill his milk n said no thats wrong.
people are stupid n get things wrong
same here with this report.
- Forums
- ASX - By Stock
- NRZ
- Ann: Update on status of Final Feasibility Study
Ann: Update on status of Final Feasibility Study, page-23
-
- There are more pages in this discussion • 73 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NRZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $8.724M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
NRZ (ASX) Chart |
Day chart unavailable