I like your enthusiasm but but i am confident you cant design and build an operational plant inclusive of well head, separators, tanks, flare, pipe runs, power generation etc, not to mention approvals from government, this would take a few years at best. Perhaps they could have a temporary pilot/testing plant or something in a 6+ month time frame if there are options like that? Remember it takes 9 -12 months to build a house with 4 walls and a roof. IMO if MAY can get a good result from Zapato and relocate the rig to Alameda ready with long lead items to drill and flow test I will be very happy with the progress for this year.
- Forums
- ASX - By Stock
- MAY
- AP We Need a 2nd Drill Rig for Block 9 ASAP
AP We Need a 2nd Drill Rig for Block 9 ASAP, page-3
-
- There are more pages in this discussion • 133 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
|
|||||
Last
2.4¢ |
Change
0.002(9.09%) |
Mkt cap ! $80.88M |
Open | High | Low | Value | Volume |
2.2¢ | 2.4¢ | 2.2¢ | $123.7K | 5.384M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 2419592 | 2.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.4¢ | 3008000 | 13 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 2419592 | 0.023 |
26 | 5502215 | 0.022 |
24 | 3202868 | 0.021 |
25 | 6238376 | 0.020 |
7 | 899744 | 0.019 |
Price($) | Vol. | No. |
---|---|---|
0.024 | 3008000 | 13 |
0.025 | 1233727 | 4 |
0.026 | 953955 | 6 |
0.027 | 1450000 | 3 |
0.028 | 1487208 | 8 |
Last trade - 16.10pm 31/07/2024 (20 minute delay) ? |
Featured News
MAY (ASX) Chart |
The Watchlist
CCO
THE CALMER CO INTERNATIONAL LIMITED
Anthony Noble, CEO
Anthony Noble
CEO
SPONSORED BY The Market Online