The Halifax-1 well had a peak gas flow rate of 4.2 MMscf/d, however, due to a faulty temperature gauge, this rate resulted in the maximum recommended temperature for the wellhead being exceeded. The faulty temperature gauge was discovered prior to shut-in of the well due to rain, at which point the well was flowing at 3.5 MMscf/d. After the well was re-opened, it flowed briefly at 4.5 MMscf/d, with the well immediately choked back to 2.0 MMscf/d to maintain temperatures within desired operating conditions, at which level it remained for the majority of March. The well is now flowing an unconstrained 1.7MMscf/d and currently flowing back stimulation fluid.
Well flowing 3.5MMscf/d before shut in
After shut in flowed 4.5MMscf/d before being choked back to 2MMscf/d
The well is now flowing 1.7MMscf/d unconstrained.
The combination of a decreased rate and a removal of the choke implies that the pressures have declined.
- Forums
- ASX - By Stock
- beach fails to fix halifax-1 flow rates still
The Halifax-1 well had a peak gas flow rate of 4.2 MMscf/d,...
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ICN (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.608M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ICN (ASX) Chart |
Day chart unavailable
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online