SLX 0.40% $5.07 silex systems limited

BWXT buys GEH Nuclear Energy Canada Inc, page-5

  1. 173 Posts.
    lightbulb Created with Sketch. 2
    A bit more on BWXT. If the shoe fits ...........

    DUF6 OPERATIONS
    DUF6conversionFacility.jpgThe construction and operation of the DUF6 Conversion plants was mandated by Congress. In August 2002, DOE awarded a contract for design, construction and initial operation of the two facilities. Since 2010, BWXT Conversion Services, LLC is the contractor for the operation of the both facilities at the Paducah and Portsmouth Sites.
    The DUF6 Conversion Process involves five parts:
    Cylinder recycling
    Vaporization
    Conversion
    Oxide powder handling
    Hydrofluoric acid recovery system.
    The process results in two products -- uranium oxide and hydrofluoric acid. The oxide is stored for eventual disposal or reuse, and the hydrofluoride can be used in industrial applications.
    There are currently more than 63,000 cylinders containing DUF6 stored in cylinder yards at the Paducah and Portsmouth sites.
    Existing inventory totals more than 740,000 metric tons.
    Typical size for a cylinder is four feet high (48 inches in diameter).
    10-ton thick-walled cylinder weighs 4,500 lbs. and can hold 20,000 lbs. of DUF6.
    14-ton thin-walled cylinder weighs 2,600 lbs. and can hold 28,000 lbs. of DUF6.
 
watchlist Created with Sketch. Add SLX (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.