Probably 50% of annual production (ie 50% of 226 ktpa).
However don't be surprised if annual production was much higher in reality (ie 260 kpta) because the concrete additive portion needs to be refined less (for both sand and contaminants).
As far as actual reserves at GW - they're practically endless. About 75% of their tenement area has not been touched by a drill bit. a lot more still to be found there.
- Forums
- ASX - By Stock
- General comments/chat
Probably 50% of annual production (ie 50% of 226 ktpa).However...
-
- There are more pages in this discussion • 31,753 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ADN (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.7¢ |
Change
-0.001(12.5%) |
Mkt cap ! $24.00M |
Open | High | Low | Value | Volume |
0.8¢ | 0.8¢ | 0.7¢ | $10.00K | 1.312M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
61 | 28008736 | 0.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.8¢ | 3800000 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
56 | 27298736 | 0.007 |
26 | 8254823 | 0.006 |
16 | 14006199 | 0.005 |
5 | 7450000 | 0.004 |
3 | 8600000 | 0.003 |
Price($) | Vol. | No. |
---|---|---|
0.008 | 3800000 | 5 |
0.009 | 19919478 | 25 |
0.010 | 6164819 | 9 |
0.011 | 27226522 | 7 |
0.012 | 29515921 | 7 |
Last trade - 16.10pm 18/10/2024 (20 minute delay) ? |
Featured News
ADN (ASX) Chart |