ADN 9.52% 1.9¢ andromeda metals limited

General comments/chat, page-14780

  1. 250 Posts.
    lightbulb Created with Sketch. 142
    Yep, its a quarrying operation but mining engineers are best suited to build the mine schedule and mining logistics until the material reached the ROM pad. Plus at 30m deep it still needs some geotech/mining control on bench sizes. Prior to production no doubt they'll hire a mining engineer to oversee this and someone has to hold the Mine Managers statutory responsibility. Until then, its better to have a qualified, experienced mine manager on board.
 
watchlist Created with Sketch. Add ADN (ASX) to my watchlist
(20min delay)
Last
1.9¢
Change
-0.002(9.52%)
Mkt cap ! $59.09M
Open High Low Value Volume
2.0¢ 2.0¢ 1.9¢ $33.38K 1.726M

Buyers (Bids)

No. Vol. Price($)
9 1823487 1.9¢
 

Sellers (Offers)

Price($) Vol. No.
2.0¢ 1122200 3
View Market Depth
Last trade - 16.10pm 31/07/2024 (20 minute delay) ?
ADN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.