ADN 9.09% 1.0¢ andromeda metals limited

From the DFS Update 10 November 2021 Item 3.3 WaterWater supply...

  1. 4,714 Posts.
    lightbulb Created with Sketch. 231
    From the DFS Update 10 November 2021 Item 3.3 Water

    Water supply solutions have progressed with SA Water. Water supply is a contentious issue across the Eyre Peninsula due to the limitations of the existing infrastructure and supply. The Company has committed to installing the required infrastructure to access water from the regional Tod Reservoir main pipeline. SA Water have confirmed there is sufficient water capacity in the main, however the reticulation from that point is at full capacity. SA Water and the Company are committed to no adverse impacts to water supply or reduction in pressure to existing users as a result of the Company's water requirement. An engineered design has been completed which includes the connection to the Tod Main supply in Poochera, a new water supply to the GWP with a tank and booster pump to maintain existing supply. The proposed water supply includes the installation of an additional supply line to the Poochera - Port Kenny Road intersection.
    With the supply to the mine , the new line may provide additional water supply capacity forb use by existing users from that point. The Company continues to work with SA Water on the advancement of an appropriate solution.

    Only a part answer lets see water turns up in later announcements.

    kippax
 
watchlist Created with Sketch. Add ADN (ASX) to my watchlist
(20min delay)
Last
1.0¢
Change
-0.001(9.09%)
Mkt cap ! $31.10M
Open High Low Value Volume
0.9¢ 1.1¢ 0.9¢ $503.0K 52.84M

Buyers (Bids)

No. Vol. Price($)
11 4749269 1.0¢
 

Sellers (Offers)

Price($) Vol. No.
1.1¢ 17804638 18
View Market Depth
Last trade - 16.10pm 23/08/2024 (20 minute delay) ?
ADN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.