IG6 8.05% 8.0¢ international graphite limited

General Discussion IG6, page-262

  1. 10,971 Posts.
    lightbulb Created with Sketch. 1773
    Commissioning of the qualification plant. Last update was that the plant is still being commissioned, not sure what the hold up is however the plan was for it to be commissioned in November 2023.

    Next planned news is due this month, with the release of the Springdale mine scoping study.

    Once that is out the company will then incorporate the mine into their scoping study for Collie BAM facility. They indicated that costs for locally produced graphite at Springdale would be cheaper than importing product. The other advantage with having in-house mining is they would have control over the quality of the input materials to the BAM facility.
 
watchlist Created with Sketch. Add IG6 (ASX) to my watchlist
(20min delay)
Last
8.0¢
Change
-0.007(8.05%)
Mkt cap ! $15.48M
Open High Low Value Volume
8.4¢ 8.4¢ 7.8¢ $31.77K 392.2K

Buyers (Bids)

No. Vol. Price($)
2 42775 7.8¢
 

Sellers (Offers)

Price($) Vol. No.
8.0¢ 58160 1
View Market Depth
Last trade - 16.10pm 13/06/2024 (20 minute delay) ?
Last
8.0¢
  Change
-0.007 ( 6.98 %)
Open High Low Volume
8.3¢ 8.3¢ 8.0¢ 22970
Last updated 15.57pm 13/06/2024 ?
IG6 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.