Hi GD
If WD is 560m, then that will obviously add a bit more time to the operation. As I said, running riser is pretty slow going. If 560m is the case, They should be drilling again by tonight I would guess.
Hole sections from here on in will go 12.25", 8.5" and then the 6" hole. In most wells around Oz, usually only 12.25" or 8.5" hole is required. In our case, due to the target depth and some possibly abnormally pressured units above the reservoir, an extra casing string is required. The 6" hole will start just above the target zone I think.
They will drill as fast as they can at all times. Slow drilling occurs for a number of reasons, including poor bit selection, hard zones, sticky zones where the bit becomes balled up and just general bit fatigue. There's probably other reasons I can't think of at the moment.
Picko
- Forums
- ASX - By Stock
- KAR
- next report or announcement
next report or announcement, page-15
-
- There are more pages in this discussion • 67 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KAR (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.72 |
Change
0.060(3.61%) |
Mkt cap ! $1.378B |
Open | High | Low | Value | Volume |
$1.67 | $1.73 | $1.67 | $18.60M | 10.89M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 48682 | $1.72 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.73 | 130076 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 6104 | 1.715 |
4 | 37026 | 1.710 |
1 | 6104 | 1.705 |
3 | 16549 | 1.700 |
1 | 6104 | 1.695 |
Price($) | Vol. | No. |
---|---|---|
1.730 | 1552 | 2 |
1.735 | 6104 | 1 |
1.740 | 21103 | 3 |
1.745 | 18263 | 4 |
1.750 | 140804 | 5 |
Last trade - 16.10pm 21/06/2024 (20 minute delay) ? |
Featured News
KAR (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online