NDO 2.22% 92.0¢ nido education limited

no big deal, page-27

  1. 6,351 Posts.
    lightbulb Created with Sketch. 100
    Been involved with other crap all day.

    OK, so we had water and C1 to C3 gas readings.

    C1 = Methane
    C2 = Ethane
    C3 = Propane.

    This spectrum would more than likely be considered in the "dry gas" range.

    For oil to be present we would've ideally seen a "wet" gas indication which would have predominantly more C4 and C5 content.
    C4 = Butane
    C5 = Pentane.

    So we have a dry hole...P&A, and move on.

    Interesting from Phil...

    "The Boni-1 side-track well will test the stratigraphic on-lap play of the Lower Gabus Formation sandstones against the Basement approximately 3 kilometres to the west of the vertical Balqis-1 well."

    According to that, we're going to drill a 3,000m side track, and do it in just 5 days, including evaluation...hmmmm.

    Lundin says we're going 800m west of the Balqis vertical well, and we're going to a planned TVD of 2,300m (MSL) (2,679m MD hole).
    I'd say we'll probably start the s/t anywhere between 1,340m and 1,420m MD, (9-5/8" shoe at 1,325 MD), but above top reservoir.

    Anyway, on, on. You only find more oil by drilling, and this isn't breaking the bank.

 
watchlist Created with Sketch. Add NDO (ASX) to my watchlist
(20min delay)
Last
92.0¢
Change
0.020(2.22%)
Mkt cap ! $209.8M
Open High Low Value Volume
88.0¢ 92.0¢ 88.0¢ $139.9K 156.8K

Buyers (Bids)

No. Vol. Price($)
1 55739 85.0¢
 

Sellers (Offers)

Price($) Vol. No.
92.0¢ 1270 1
View Market Depth
Last trade - 16.10pm 31/07/2024 (20 minute delay) ?
NDO (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.