STX 12.0% 28.0¢ strike energy limited

plain as day, page-18

  1. Ya
    6,809 Posts.
    lightbulb Created with Sketch. 3828
    They'll work out a sustained flowrate (10-20 mmcfd??) once the gas is bypassed thro' the Desander unit, so a choked back flow is what I think should transpire once they get a better grip on the situation. Just look up the spec sheet for a 62020 Desander (ie known nozzle inlet, pressure rating, outflw etc).

    Also a lot of data on the sand grain size distribution, pressure differential & best choke size etc will b collated to get a better picture going fwd.
    Key thing is to suss out the threshold limit of lbs of sands that r coming up per mmcf of gas (eg: 0.1 lbs/mmcf etc etc).

    Ultra-high gas flowrate wells worldwide (and some big bore's in the NWshlf) have had to deal with this issue, so as to establish minimal damage to surface equipment & downtime with Sand control etc. The JV r better off in knowing about the issues that may crop up later during Development including mitigation etc. Isn't the first time 'fines' have been produced and it wont b the last, unknown of course is how much sand comes up during flow, enough to build a sand castle for l'l johnny??
 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
28.0¢
Change
0.030(12.0%)
Mkt cap ! $801.0M
Open High Low Value Volume
24.5¢ 28.3¢ 24.5¢ $7.221M 26.82M

Buyers (Bids)

No. Vol. Price($)
5 293004 27.5¢
 

Sellers (Offers)

Price($) Vol. No.
28.0¢ 820079 16
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.