POS 0.00% 0.4¢ poseidon nickel limited

The Black Swan drilling was an infill program on a low grade ore...

  1. 1,059 Posts.
    lightbulb Created with Sketch. 598
    The Black Swan drilling was an infill program on a low grade ore body. The assays are only useful when combined and interpreted as a whole - that is what we are waiting for because that will tell us about any extension of project life for the smelter grade product. Unless something unusual was encountered (company has confirmed this not to be the case) you wouldn’t expect to see assays. There is a huge amount of low grade ore beneath the open pit, but the short term question is how much of it is Serpentinite and suitable for Stage 1 processing?

    LJ drilling is an exploration program, so yes, you would expect to see assay results when the are available. Would think later next month.
 
watchlist Created with Sketch. Add POS (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $14.85M
Open High Low Value Volume
0.5¢ 0.5¢ 0.4¢ $2.935K 637.6K

Buyers (Bids)

No. Vol. Price($)
94 65960352 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 18994182 38
View Market Depth
Last trade - 16.10pm 17/07/2024 (20 minute delay) ?
POS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.