re: pre-open!!!! worrior completed for production
McKinlay ; 1585 bopd
Birkhead : 3000 bopd (not a typo. Three thousand barrels per day)
Hutton : 815 bopd
Production ot be compelted from the McKinlay at 1200-1600 bopd, with production being trucked to Santos.
5-10 bcf of gas estimated in the Patchawarra.
****
At 1400 bopd, this is worth roughly $20 000 net free cash a day to STU, and $7000 a day to COE.
It increases their daily production by about 100% for STU and 150% for COE.
Buy, buy, buy.
Ian Whitchurch
- Forums
- ASX - By Stock
- pre-open!!!! eom
re: pre-open!!!! worrior completed for production McKinlay ;...
-
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add COE (ASX) to my watchlist
|
|||||
Last
23.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $607.2M |
Open | High | Low | Value | Volume |
23.0¢ | 23.0¢ | 22.5¢ | $104.9K | 462.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
17 | 432245 | 22.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
23.0¢ | 2438699 | 29 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
17 | 433480 | 0.225 |
18 | 611060 | 0.220 |
13 | 1926300 | 0.215 |
12 | 552069 | 0.210 |
17 | 458444 | 0.205 |
Price($) | Vol. | No. |
---|---|---|
0.230 | 2476080 | 34 |
0.235 | 1100714 | 26 |
0.240 | 3907524 | 28 |
0.245 | 455210 | 14 |
0.250 | 753468 | 15 |
Last trade - 10.56am 31/07/2024 (20 minute delay) ? |
Featured News
COE (ASX) Chart |
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online