HIO 12.5% 2.1¢ hawsons iron ltd

Price and Chart HIO, page-5347

  1. 2,961 Posts.
    lightbulb Created with Sketch. 4335
    No. That's not how Bryan team looks at. The fact they lodge the Scoping Report to the NSW Mining Department stating Hawsons project as a 20mtpa operation for 20+ years shows that Bryan team knows they will have enough at least 400mt resource.

    I also explained in details before how I expect total resource of more than 500mt to be eventually all converted to Indicated/Measured category. In other words, if we see 300mt in Indicated/Measured category and 200mt in Inferred category in the coming update = 500mt total resource, this 500mt will be eventually all in Indicated/Measured category. That is because in 2016/2017 drilling campaign they were able to convert massive 96% of Inferred to Indicated at 9.5% DTR cut-off grade at the section where they did the in-fill drilling. Then in Oct 2021 the KPS report came out with optimal cut-off grade of 6% DTR grade. This 6% optimal cut-off grade basically bring the previous conversion rate of 96% to 100% conversion rate from Inferred category to Indicated category. Therefore i believe Bryan team KNOWS with the now optimal 6% DTR cut-off grade he will have all 500mt eventually under Indicated/Measured category. And that is why you can see he always presented Hawsons project as a 20mtpa operation-400mt resource project with slurry pipeline and Myponie Point port also as a 20mtpa operation set-up.

    Bryan team must be absolutely sure they know what they are talking here. They know what they have there. They need 400mt. They have >500mt and they know it will be all in Indicated/Measured category eventually.



 
watchlist Created with Sketch. Add HIO (ASX) to my watchlist
(20min delay)
Last
2.1¢
Change
-0.003(12.5%)
Mkt cap ! $23.37M
Open High Low Value Volume
2.3¢ 2.3¢ 2.1¢ $25.43K 1.173M

Buyers (Bids)

No. Vol. Price($)
3 814934 2.1¢
 

Sellers (Offers)

Price($) Vol. No.
2.2¢ 120000 2
View Market Depth
Last trade - 11.35am 20/08/2024 (20 minute delay) ?
HIO (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.