I've posted this in the quarterly thread but feel it would reach more investors on this thread.
Excellent quarterly! Over the duration of the 2024 drilling season, we can look forward to the following;
Sybella - 150 holes plus phase 2 lab results.
Gidyea - 1 hole
Lawn Hills - 1 Hole
Three Ways - 1 Hole (Need confirmation that will be drilled in 2024) Land access preparations for drilling are underway.
Pardoo - 1 hole (Need confirmation that will be drilled in 2024) Land access preparations for drilling are underway.
Yarrie - Up to 8 holes (Need confirmation that will be drilled in 2024) Drill site & access track preparation are on track to begin in Q2.
- Forums
- ASX - By Stock
- Red Metal Banter
I've posted this in the quarterly thread but feel it would reach...
- There are more pages in this discussion • 29 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RDM (ASX) to my watchlist
(20min delay)
|
|||||
Last
17.0¢ |
Change
-0.010(5.56%) |
Mkt cap ! $52.38M |
Open | High | Low | Value | Volume |
18.5¢ | 18.5¢ | 17.0¢ | $69.76K | 394.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 30277 | 17.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
17.0¢ | 65355 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 81267 | 0.170 |
4 | 184398 | 0.165 |
2 | 284500 | 0.160 |
6 | 159655 | 0.155 |
8 | 100326 | 0.150 |
Price($) | Vol. | No. |
---|---|---|
0.175 | 17142 | 1 |
0.180 | 73510 | 2 |
0.185 | 141165 | 4 |
0.190 | 92473 | 3 |
0.195 | 105641 | 5 |
Last trade - 15.56pm 21/05/2024 (20 minute delay) ? |
|
|||||
Last
17.0¢ |
  |
Change
-0.010 ( 8.11 %) |
|||
Open | High | Low | Volume | ||
18.0¢ | 18.0¢ | 17.0¢ | 209248 | ||
Last updated 15.54pm 21/05/2024 ? |
Featured News
RDM (ASX) Chart |
The Watchlist
AUQ
ALARA RESOURCES LIMITED
Stephen Gethin, Non-Executive Director & Chairman
Stephen Gethin
Non-Executive Director & Chairman
Previous Video
Next Video
SPONSORED BY The Market Online