RLT 0.69% 72.0¢ renergen limited

Renergen General Discussion, page-2708

  1. 4,000 Posts.
    lightbulb Created with Sketch. 933
    Phase One full caoacity is 300-350kg per day of liquid helium production. So about 2 weeks to fill a Linde 40ft liquid helium iso container running the plant at full capacity. About a month then if ramping up and running at average 50% of capacity.

    41000 litres = 5123kg of liquid helium.

    https://hotcopper.com.au/data/attachments/6043/6043531-2d0cf5de2808686f50ae6b0ef339652c.jpg
    https://hotcopper.com.au/data/attachments/6043/6043533-071eadb30dbb97e7888d058e94e2bd03.jpg





 
watchlist Created with Sketch. Add RLT (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.