"Now, going back to my estimates they are for the area around holes 1 and 2 (2017) where the current drilling program (i.e. the current 20,000 metre program) is targetting)."
I did understand your reference was around the first and second drill holes. But it seems to me your calculation assumes drill holes parallel to each other (which is ideal for maximizing volume but not what they are actually doing). I think the volume sampled decreases in practice though as the drilled holes are not parallel.
- Forums
- ASX - By Stock
- AVZ
- Running discussion on SP
Running discussion on SP, page-1307
-
-
- There are more pages in this discussion • 81,664 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
AVH
Avita boosts skin restoration product portfolio with 'dermal matrix' – a kind of next-level gauze made of fake skin
GML
Gateway Mining sells WA Eastern Montague gold project to Brightstar for $14M – half of that in shares