GBE 0.00% 5.1¢ globe metals & mining limited

sorry, "operating costs" is wrong. Meant to say "total" cost...

  1. 1,258 Posts.
    sorry, "operating costs" is wrong. Meant to say "total" cost incl. financing cost and other overhead costs booked on the project. Spot was about 46US$/lb in Q32009 so total production costs were higher than U-spot price.
 
watchlist Created with Sketch. Add GBE (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.