I was informed during the start up last year that the barge loading facility had regular downtime during the first few weeks due to build up of clay in sections of the facility. There were also issues with the automatic sampling which was offline for an extended time. Being a very wet end to the wet season the trucks may not be being loaded to capacity and as the Xinfa shipments need to be sourced from the lower silica BH1, where there is a 40km round trip per load this may be the issue at present. It takes a few weeks to dry out and usually does quite quickly. Nothing to worry about but worth a release.
- Forums
- ASX - By Stock
- MMI
- The Future
The Future, page-48
-
-
- There are more pages in this discussion • 153 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MMI (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.1¢ |
Change
-0.001(1.92%) |
Mkt cap ! $303.7M |
Open | High | Low | Value | Volume |
5.1¢ | 5.1¢ | 4.8¢ | $1.317M | 26.39M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 826062 | 4.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.1¢ | 3333819 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 826062 | 0.049 |
1 | 2093549 | 0.048 |
2 | 2000000 | 0.046 |
3 | 246120 | 0.045 |
3 | 168000 | 0.044 |
Price($) | Vol. | No. |
---|---|---|
0.051 | 3333819 | 3 |
0.052 | 1784327 | 4 |
0.053 | 6527265 | 10 |
0.054 | 2412648 | 9 |
0.055 | 1690993 | 12 |
Last trade - 16.10pm 05/11/2024 (20 minute delay) ? |
Featured News
MMI (ASX) Chart |