IVZ 1.15% 8.8¢ invictus energy ltd

time, page-6

  1. 3,706 Posts.
    lightbulb Created with Sketch. 2852
    "Scott also stated an intention to put in the liner and drill deeper in 6 inch. I wasn't sure if that meant in this campaign or later. If in this campaign then he must have included the lining, extension and suspension in his 28 days."

    7" liner will be run and the well suspended after sidetrack is drilled and logged.


    "He did say 1 week to 10 days drilling, then logging and sampling. With the programmed reduced logging and sampling planned early, we could have a sample relatively soon. Just my take."

    Around a week from now to plug back well and initiate sidetrack.

    Getting off the kick off plugs can often take multiple attempts and once theyre of the plugs theres a trip out of the hole to pick up LWD tools.


 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.