MGT 2.53% 38.5¢ magnetite mines limited.

THis article cant come at a better time. The three phases to...

  1. 984 Posts.
    lightbulb Created with Sketch. 243
    THis article cant come at a better time.

    The three phases to green steel production | Spectra (mhi.com)

    https://hotcopper.com.au/data/attachments/5891/5891029-0bb3dfab4fda3aa8b6438ce36b439d8e.jpg

    Meanwhile, new technologies are emerging at an auspicious time. With about 70% of all BFs worldwide requiring relining by 2030, producers have a near-term opportunity to shift toward two key innovations: direct reduction of iron ore (DRI) and electrification.The MIDREX direct reduction process has gained traction worldwide as a leading DRI process, with immediate benefits for the reduction of CO2 and the production of high-quality merchant hot-briquetted iron (HBI). "

    To cut things short, these people are going to rush to secure supply and the last 3 phases needs high quality ore. The BF-BOF is only going to probably going to be used in india for another 5-10 years before they realize that no european/asian countries are buying their raw steel due to carbon tax/penalties, etc.

    I hope Gemma and team have a good update for us!! WOOHOO
 
watchlist Created with Sketch. Add MGT (ASX) to my watchlist
(20min delay)
Last
38.5¢
Change
-0.010(2.53%)
Mkt cap ! $37.89M
Open High Low Value Volume
38.5¢ 41.0¢ 38.5¢ $71.63K 181.9K

Buyers (Bids)

No. Vol. Price($)
1 18701 38.5¢
 

Sellers (Offers)

Price($) Vol. No.
40.0¢ 63571 2
View Market Depth
Last trade - 16.10pm 16/05/2024 (20 minute delay) ?
Last
38.5¢
  Change
-0.010 ( 1.28 %)
Open High Low Volume
40.0¢ 40.5¢ 38.5¢ 22684
Last updated 15.42pm 16/05/2024 ?
MGT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.