CYM 0.00% 2.3¢ cyprium metals limited

From the little I understand about this project, assuming the...

  1. 5,701 Posts.
    lightbulb Created with Sketch. 1748
    From the little I understand about this project, assuming the open pit goes to plan, and they stick to heap leaching, the bottleneck, as far as I can tell, is the heap leaching. The next bottleneck would be the electro-winning plant.

    I watched that flyover of the pit on the new website yesterday and thought to myself "what a mess". It seems daunting to get that back to a safely operating open pit, but if someone asked me to build a bridge over a river I wouldn't know how to do that either.
    Last edited by tinhat: 21/10/21
 
watchlist Created with Sketch. Add CYM (ASX) to my watchlist
(20min delay)
Last
2.3¢
Change
0.000(0.00%)
Mkt cap ! $39.36M
Open High Low Value Volume
2.5¢ 2.6¢ 2.2¢ $26.04K 1.118M

Buyers (Bids)

No. Vol. Price($)
4 750347 2.3¢
 

Sellers (Offers)

Price($) Vol. No.
2.5¢ 50000 1
View Market Depth
Last trade - 16.10pm 02/01/2025 (20 minute delay) ?
CYM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.