750,000t Mn means 6,000,000t excavation based on the 12.5% average sampled, and as posted recently, those samples would be the best their best selective mustering.
Anyway, 6,000,000t/year = 11.4t excavated every minute of every day over the year.
And that's just the start of it.
- Forums
- ASX - By Stock
- why hasnt drilling started yet
750,000t Mn means 6,000,000t excavation based on the 12.5%...
-
- There are more pages in this discussion • 284 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KAB (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
CCO
THE CALMER CO INTERNATIONAL LIMITED
Anthony Noble, CEO
Anthony Noble
CEO
SPONSORED BY The Market Online