POS 0.00% 0.5¢ poseidon nickel limited

Windarra Gold Tailings, page-11

  1. 1,715 Posts.
    lightbulb Created with Sketch. 166
    Hi Kip
    To proccess those tails off site when the grade is about 0.6gr and due to them being in sulphides recoverys will only be about 50/60 % you will need a G/P over $2000 /oz as most plants not set up to handle this type of product, also trucking the product is expensive .
    To process yourself is only option as i see it, it is cheap to move tails with water (hydraulic mining ) and plant could be set up to fine grind if required to increase recoverys. I would think 30 mil might cover costs for new plant but depends on things like current power supply ,acc camp , bore fields , tails dam ect
    hope this helps.
 
watchlist Created with Sketch. Add POS (ASX) to my watchlist
(20min delay)
Last
0.5¢
Change
0.000(0.00%)
Mkt cap ! $18.56M
Open High Low Value Volume
0.5¢ 0.5¢ 0.5¢ $13.20K 2.695M

Buyers (Bids)

No. Vol. Price($)
85 68247426 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 5947343 19
View Market Depth
Last trade - 16.10pm 31/07/2024 (20 minute delay) ?
POS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.