The product qualification facility is likely the old laboratory facility from Christoph Frey, which was operated for a period of time in Germany as a "pilot plant." The equipment fits into a container. Presumably, the equipment needs to be cleaned, the container shipped, and a plot of land with electricity and water connections found in Australia to re-establish the facility. Then, a fluffy announcement: "Product Qualification Facility built and ready to run," and Andrew can celebrate once again.
It would be better to let the container in Germany and place it in Schwarzheide or Ludwigshafen on the BASF ground to conduct tests together with the new MOU partner BASF.
- Forums
- ASX - By Stock
- Ann: Collaboration with BASF on Anode Recycling
The product qualification facility is likely the old laboratory...
Featured News
Add EGR (ASX) to my watchlist
(20min delay)
|
|||||
Last
15.0¢ |
Change
0.010(7.14%) |
Mkt cap ! $65.83M |
Open | High | Low | Value | Volume |
14.5¢ | 15.0¢ | 14.5¢ | $13.52K | 93.28K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 128458 | 14.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
15.0¢ | 116998 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 128458 | 0.140 |
7 | 227000 | 0.135 |
7 | 201231 | 0.130 |
1 | 200000 | 0.125 |
2 | 150000 | 0.120 |
Price($) | Vol. | No. |
---|---|---|
0.150 | 116998 | 4 |
0.155 | 8210 | 3 |
0.160 | 117500 | 4 |
0.165 | 67615 | 3 |
0.170 | 14881 | 2 |
Last trade - 12.05pm 15/05/2024 (20 minute delay) ? |
|
|||||
Last
14.0¢ |
  |
Change
0.010 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
14.5¢ | 14.5¢ | 14.0¢ | 35735 | ||
Last updated 11.53am 15/05/2024 ? |
Featured News
EGR (ASX) Chart |
The Watchlist
SS1
SUN SILVER LIMITED
Gerard O’Donovan, Executive Director
Gerard O’Donovan
Executive Director
SPONSORED BY The Market Online