Id think they would have the answering machine on and the doors locked for a long weekend to let everyone cool down.
- Forums
- ASX - By Stock
- Ann: Procurement of Long Lead Items for the Great White Project
Id think they would have the answering machine on and the doors...
- There are more pages in this discussion • 463 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ADN (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.9¢ |
Change
0.002(11.8%) |
Mkt cap ! $59.09M |
Open | High | Low | Value | Volume |
1.8¢ | 2.0¢ | 1.7¢ | $163.3K | 8.870M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 499999 | 1.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.0¢ | 4674105 | 20 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 160994 | 0.019 |
5 | 2905430 | 0.018 |
24 | 6892132 | 0.017 |
35 | 8695387 | 0.016 |
22 | 5316448 | 0.015 |
Price($) | Vol. | No. |
---|---|---|
0.019 | 684975 | 2 |
0.020 | 5096638 | 21 |
0.021 | 3139035 | 7 |
0.022 | 1873910 | 9 |
0.023 | 1051330 | 6 |
Last trade - 16.10pm 20/05/2024 (20 minute delay) ? |
|
|||||
Last
1.9¢ |
  |
Change
0.002 ( 11.1 %) |
|||
Open | High | Low | Volume | ||
1.8¢ | 2.0¢ | 1.7¢ | 3136923 | ||
Last updated 15.59pm 20/05/2024 ? |
Featured News
ADN (ASX) Chart |