ADT 1.31% $4.65 adriatic metals plc

The scope of this exercise is limited to the volume of rock...

  1. 613 Posts.
    lightbulb Created with Sketch. 421
    The scope of this exercise is limited to the volume of rock between barn-burner holes BR-1-17 and BR-2-18.  It is important to note that the following estimate is intended to capture just the tonnage and value created by the step out hole BR-2-18. The volume of rock represents just a fraction of the total mineralized area and the actual resource estimate 1H19 is likely to far exceed the estimates rendered below.


    TONNAGE

    Per the drill announcement, BR-2-18 was drilled 80m down dip and 50m down plunge from hole BR-1-17.

    See excerpt from the announcement below:



    BR-1-17 was drilled at -90° dip angle so the 64m intercept should be close to true vertical thickness. However, BR-2-18 was drilled at a -60° dip angle. To calculate true vertical thickness we can use basic function 64m * COS (60) = 32m. The blended average is 48m.

    Therefore we assume dimensions as follows:

    - 50m strike
    - 80m lateral width
    - 48m vertical thickness

    As for density, I use the weighted average of sphalerite (3.6t/m^3) and barite (4.4t/m^3) which give me a specific gravity of 4t/m^3.

    Tonnage is calculated as follows:

    50m strike * 80m lateral width * 48m vertical thickness * density of 4t/m^3 = 768,000 tonnes


    GRADE

    You can see in the long-section below that grade continuity is excellent for at least 150m from BR-7-17 to BR-2-18.



    However, for this exercise, we only care about how many tonnes and the value added therein as a result of this stepout hole.

    BR-1-17: 8.5% Zn, 5.1% Pb, 374g/t Ag, 2.3g/t Au, 1.0% Cu
    BR-2-18: 10.5% Zn, 7.7% Pb, 537g/t Ag, 4.4g/t Au, 0.9% Cu

    Weighted average: 9.2% Zn, 6% Pb, 428g/t Ag, 3.0g/t Au, 1% Cu


    POTENTIAL REVENUES

    Input assumptions:







    Throw it all in the blender and I get the following revenue per tonne mined for each of the three saleable concentrates:

    - Zn Concentrate = US$175.14 per mined tonne
    - Pb Concentrate = US$221.44 per mined tonne
    - Cu Concentrate = US$109.93 per mined tonne

    Total revenue per mined tonne = $506.51 per mined tonne

    If we multiply by tonnage = $506.51 * 768,000t = $389M


 
watchlist Created with Sketch. Add ADT (ASX) to my watchlist
(20min delay)
Last
$4.65
Change
0.060(1.31%)
Mkt cap ! $1.196B
Open High Low Value Volume
$4.67 $4.70 $4.56 $2.077M 448.4K

Buyers (Bids)

No. Vol. Price($)
13 5149 $4.64
 

Sellers (Offers)

Price($) Vol. No.
$4.66 2560 8
View Market Depth
Last trade - 12.52pm 16/05/2024 (20 minute delay) ?
Last
$4.65
  Change
0.060 ( 1.52 %)
Open High Low Volume
$4.59 $4.70 $4.56 66705
Last updated 13.10pm 16/05/2024 ?
ADT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.